en
Ian McLean

Class 47s

Berätta för mig när boken läggs till
För att kunna läsa den här boken överför filer i EPUB- eller FB2-format till Bookmate. Hur laddar jag upp en bok?
Following on from Class 47s: Inverness to Penzance, 1982–85, this volume picks up the story and runs to the end of the summer 1986 timetable. It was a period of change, as the first 47s to be withdrawn started to fall by the wayside in the spring of 1986, since seriously damaged crash victims were no longer likely to be rebuilt. The first non-crash-damaged locos were withdrawn — sacrificed to provide a spares pool for the others. It was also a time of change with regard to how trains were heated, as steam heat became rare south of Hadrian’s Wall. Christmas 1985 was a watershed as the relief trains were now routinely electrically heated, with the latest ETH conversions emerging from Crewe Works from November 1985. In 1986, regular trips to Scotland were required to sample the delights of steam heat. Further changes came in summer 1986 as InterCity started to operate some routes in Kent, and Dover Western Docks was now on the map. With over 200 images, this volume provides a visual journey of the Class 47s in 1985–86.
Den här boken är inte tillgänglig just nu
247 trycksidor
Ursprunglig publicering
2022
Utgivningsår
2022
Har du redan läst den? Vad tycker du om den?
👍👎
fb2epub
Dra och släpp dina filer (upp till fem åt gången)